SKIP TO MAIN CONTENT

South Australia announces $550m energy overhaul

site_197_Filipino_646906.JPG

The South Australian government will spend half-a-billion-dollars building the country's largest battery storage project, along with a new state-owned, gas-fired power plant. The major spend comes nearly six months after a state-wide blackout that left over a million people without power, and sparked a political debate over the reliability of wind and solar energy.


Published

Updated

Presented by Maridel Martinez

Source: SBS



Skip to podcast episode content

The South Australian government will spend half-a-billion-dollars building the country's largest battery storage project, along with a new state-owned, gas-fired power plant. The major spend comes nearly six months after a state-wide blackout that left over a million people without power, and sparked a political debate over the reliability of wind and solar energy.


The 100-megawatt battery will be the same size as the one proposed by Elon Musk, the billionaire C-E-O of the technology company Tesla.  The battery will be built by the private sector - with support from a government renewables fund. 

Image: South Australian Premier Jay Weatherill and Energy Minister Tom Koutsantonis. (AAP)


Latest podcast episodes

Follow SBS Filipino

Download our apps

Listen to our podcasts

Get the latest with our exclusive in-language podcasts on your favourite podcast apps.

Watch on SBS

SBS News in Filipino

Watch it onDemand

Stream now