SKIP TO MAIN CONTENT

New Snowy hydro scheme labelled 'worst possible project"

The Tumut 3 power station at the Snowy Hydro Scheme in Talbingo
The Tumut 3 power station at the Snowy Hydro Scheme in Talbingo Source: AAP

The Snowy Hydro 2.0 has been labelled "the worst possible project" for Australia's transition to renewable energy.


Published

Updated

By Đăng Trình, Abbie O’Brien

Source: SBS



Skip to podcast episode content

The Snowy Hydro 2.0 has been labelled "the worst possible project" for Australia's transition to renewable energy.


A report into the federal government's multi-billion dollar scheme outlines huge financial and environmental costs


Latest podcast episodes

Follow SBS Vietnamese

Download our apps

Listen to our podcasts

Get the latest with our exclusive in-language podcasts on your favourite podcast apps.

Watch on SBS

SBS World News

Take a global view with Australia's most comprehensive world news service

Stream now