New Snowy hydro scheme labelled 'worst possible project'03:33SBS News In DepthFollow and SubscribeFollow and SubscribeFollow and Subscribe Apple Podcasts Spotify Listnr Download (6.52MB)Download the SBS Audio appAvailable on iOS and AndroidThe Tumut 3 power station at the Snowy Hydro Scheme in Talbingo Source: AAPAcademic report claims Snowy 2.0 will consume more power than it produces and will 'trash the environment'.Follow and Subscribe Apple Podcasts Spotify Listnr Download (6.52MB)Download the SBS Audio appAvailable on iOS and AndroidPublished 15 October 2019 6:43pmBy Abbie O'BrienSource: SBSSkip to podcast episode contentShare this with family and friendsCopy linkShareAcademic report claims Snowy 2.0 will consume more power than it produces and will 'trash the environment'.ShareLatest podcast episodes01:36Pacific Islands Forum in Palau to get underway with a number of leaders absentpodcast episode1 minute 36 seconds05:00Teachers treated with 'contempt': how the manosphere is changing school students’ behaviourpodcast episode5 minutes08:30What's in a word? Recording unique Australian regionalismspodcast episode8 minutes 30 seconds19:54Why Australia Post is in the fight of its life and what it means for consumerspodcast episode19 minutes 54 seconds