New Snowy hydro scheme labelled 'worst possible project'03:33SBS News In DepthFollow and SubscribeFollow and SubscribeFollow and Subscribe Apple Podcasts Spotify Listnr Download (6.52MB)Download the SBS Audio appAvailable on iOS and AndroidThe Tumut 3 power station at the Snowy Hydro Scheme in Talbingo Source: AAPAcademic report claims Snowy 2.0 will consume more power than it produces and will 'trash the environment'.Follow and Subscribe Apple Podcasts Spotify Listnr Download (6.52MB)Download the SBS Audio appAvailable on iOS and AndroidPublished 15 October 2019 6:43pmBy Abbie O'BrienSource: SBSSkip to podcast episode contentShare this with family and friendsCopy linkShareAcademic report claims Snowy 2.0 will consume more power than it produces and will 'trash the environment'.ShareLatest podcast episodes08:31Will AI Take Our Jobs? The RBA Weighs Inpodcast episode8 minutes 31 seconds06:21The hidden climate price of the AI revolutionpodcast episode6 minutes 21 seconds04:42Trump vs the press: How far can the White House go?podcast episode4 minutes 42 seconds14:17Penny Wong on Australia's bid for a seat at the security councilpodcast episode14 minutes 17 seconds